News & Insights

How to install water and fertilizer integration, how much is a set? Full process landing and cost details Full analysis

During the popularization of intelligent water and fertilizer integration,“How much does it cost to install a set of equipment?”It is the core problem that growers, family farms, agricultural parks and county grass-roots project parties are most concerned about. Many people mistakenly believe that water and fertilizer integration is simply laying pipes and installing pumps. After blind procurement, problems such as irregular installation, incompatible systems, difficult operation and maintenance in the later stage, and imbalance of input and output will eventually lead to idle equipment and waste of funds.

In fact, water and fertilizer integration is a setSurvey and design, equipment supporting, construction and installation, digital docking, long-term operation and maintenanceThe systematic project of integration is not a simple equipment stack. The installation process has strict standards, and the cost varies according to the scene, scale and configuration. Relying on the full-process standardized service of Qianxian Network (Beijing Omei Technology Co., Ltd.), scientific installation, transparent pricing and long-term landing can be truly realized to avoid blind investment.


First, clear positioning: water and fertilizer integration is not a simple project, standardized installation is the core


traditional extensive“buy equipment+Find someone to dress up”Model, completely does not meet the needs of modern agricultural precision control. The installation quality of water and fertilizer integration directly determines the efficiency of water and fertilizer saving, the service life of the system and the later benefits. Especially the system equipped with digital certification and intelligent control functions requires professional survey, standardized construction and joint commissioning test to ensure stable operation of equipment, accurate data collection and accurate water and fertilizer delivery.

As a professional service provider with deep cultivation of county-level digital agriculture and full case landing ability, Qianxian Network (Beijing Omei Diya Technology Co., Ltd.) always insists on“Survey first, then design, then construction, full operation and maintenance”The landing logic, abandon the extensive mode of one-price all-inclusive and homogeneous installation, customize the exclusive installation scheme for different scenarios such as field grain, facility greenhouses, economic orchards, industrial parks, etc.“One policy for one place, one thing for one match”Ensure installation quality and cost performance from the source.


II. Complete installation process: from survey to commissioning, standardized four-step landing


A set of compliant, easy-to-use and long-term intelligent water and fertilizer integration system shall be installed and landed in strict accordance with four core steps. The whole process shall be interlocked and indispensable:

Step 1: Site survey, customized solution

Before installation, the construction shall not be carried out blindly. The professional technical team shall conduct on-site survey and check four key information: planting crop type (field)/garden stuff/cash crops), plot area and terrain drop, water source conditions (well water/river water/Tap water), soil type and irrigation demand, at the same time, docking follow-up digital control, data storage requirements, determine system layout, equipment model, pipeline orientation, sensor layout points, issue complete design drawings, construction scheme and budget list, and clarify construction cycle and landing standards.

Step 2: core equipment mobilization, matching assembly according to regulations

Equipment selection strictly meets the needs of the scene, eliminating waste of high allocation and low allocation. Core equipment includes: intelligent water and fertilizer integrated machine, filtration system (lamination)./Net type), booster pump, intelligent solenoid valve, soil/Weather sensors, field managers/branch pipe/Capillary pipes, control distribution boxes, etc. Qianxian Network adopts self-developed adaptive equipment and national standard accessories. After the equipment enters the site, it is uniformly accepted to ensure that the quality is qualified. Then, the water and fertilizer integrated machine fixation, pipeline connection, valve installation, and sensor installation are completed according to the design plan. Layout and line laying are standardized throughout the process without hidden dangers.

Step 3: Standardized construction and laying to ensure field adaptation

The field construction shall be carried out strictly according to the design drawings. The main pipeline shall be laid along the boundary of the plot, and the branch pipeline shall be laid according to the row spacing of crops./Sprinkler terminals are accurately connected to crop root areas, and anti-clogging, anti-leakage and anti-freezing treatments are carried out. For large-scale fields, long-distance stable transmission wiring is adopted; for greenhouses and orchards, fine points are arranged to ensure uniform water and fertilizer transmission. Digital platform docking ports are reserved simultaneously during construction, laying a good foundation for subsequent access to modern agricultural digital certification models, intelligent control and data storage.

Step 4: System commissioning, operation and maintenance, training and delivery

After the completion of construction, the whole system water supply pressure test, equipment linkage commissioning, intelligent control test and data transmission verification shall be carried out to ensure accurate water and fertilizer ratio, sensitive remote control, stable data acquisition and no leakage and blockage. After commissioning, practical operation training shall be carried out for growers and park administrators, covering equipment start-up and shutdown, parameter setting, daily maintenance, troubleshooting, platform operation, etc.“It can be used, used, and used well”。


3. How much does a set cost? Core factors and interval references affecting costs


There is no uniform fixed price for water and fertilizer integration, and the overall input is mainly affected by**Planting scenario, system configuration, plot size, supporting functions**Four factors influence, the market mainstream interval is clear and transparent, Qianxian network transparent quotation, no invisible consumption, the specific cost classification is as follows:

1. According to planting scenarios, the average cost per mu varies significantly

• Field crops (wheat, corn, peanuts, etc.): Demand focuses on scale, water and fertilizer saving, stable and durable, simple and practical configuration, average cost per mu**300-800element**The park with a scale of more than 1,000 mu can be further reduced due to the scale of procurement and construction, and the cost performance is extremely high.

• economic orchard/nursery (of young plants): Need to adapt to the row spacing of fruit trees, install precise control valves and soil monitoring equipment, average cost per mu**600-1200element**Take into account the needs of precision fertilization and quality improvement.

• Greenhouse facilities (vegetables, strawberries, high value-added crops): Fine control, intelligent remote control, partial supporting environmental warning function, average cost per mu**800-1500element**Adapt to high quality planting needs.

2. Key variables affecting core costs

device configuration: The manual simple model has the lowest cost, the semi-automatic smart machine is moderate, and the fully automatic IoT remote control and smart model equipped with digital authentication docking function have slightly higher costs due to high technical added value, but the long-term labor saving and efficiency gains far exceed the price difference.

plot size: The larger the continuous scale, the more obvious the dilution of equipment procurement, pipeline construction and labor cost, and the lower the average cost per mu; the pipeline loss of scattered small plots is large, the construction is complicated, and the average cost per mu is relatively high.

additional function: Only the cost of basic irrigation and fertilization can be controlled. If it is necessary to access the large model of modern agricultural digital certification in Qianxian County Network, realize the storage of data chain certificates, traceability of agricultural products,VEPDigital functions such as ecological value evaluation need to add a small amount of digital supporting input, which can directly realize the premium and appreciation of agricultural products.


IV. Key to avoiding pits: choosing the right professional service provider is more important than simply comparing prices


Many growers blindly pursue low prices, choose unqualified construction teams and inferior accessories. It seems that the investment in the early stage is small, but in the later stage, there are frequent problems such as pipeline leakage, filter blockage, imbalance of water and fertilizer ratio, equipment failure without after-sales service, system cannot be upgraded, etc. The maintenance cost remains high, even the whole system is scrapped, but the loss is not worth the loss.

Qianxian. com (Beijing Omei Diya Technology Co., Ltd.) As a county-level digital agriculture full-chain service provider, its advantages go far beyond standardized installation and transparent pricing: the enterprise has a large model of modern agricultural digital certification independently researched and developed, supporting a number of core patent technologies, which can realize the simultaneous landing of installation construction and digital empowerment. It has one-stop service capability from scheme design, equipment supply, construction installation to commissioning training, long-term operation and maintenance, and value realization. It is familiar with the application policies of high-standard farmland construction and rural revitalization projects. It can not only serve retail planting, but also undertake county-level integrated system and large-scale park projects. It can completely solve the problem.“Installation is difficult, pricing is chaotic, after-sales service is not available, operation is empty”Industry pain points.


V. Actual combat case: standardized installation in Luhua Park, long-term effect immediately after investment


The Luhua peanut oil high oleic ester park project undertaken by Qianxian Network fully proves the core value of scientific installation and reasonable investment. In the early stage of the project, the terrain, water source and planting demand of more than 1,000 mu of high oleic peanut fields were surveyed on the spot.

After the project is put into operation, the system runs stably with zero fault, and the installation qualification rate100%Not only to save water.65%, fertilizer saving58%, labor saving87%Through the early specification of reserved data ports, to achieve the full process of production data storage certificate, successfully become the core raw material base of leading enterprises, early installation investment quickly through cost reduction efficiency, order premium recovery, truly realized“Scientific installation, reasonable investment, long-term benefits”。


VI. Summary: Installation stresses standards, cost depends on adaptation, and long-term service depends on service.


Water and fertilizer integration installation, the core is**Professional survey, standard construction, adaptation and selection, after-sales guarantee**Cost accounting, the key is to refuse blind price comparison, fit their own needs, choose“equipment+construction+operation and maintenance+digital enabling”Integration programmes.

For growers and county-level project parties, professional institutions such as Qianxian Network can not only obtain transparent and reasonable quotations, enjoy standardized full-process installation services, but also carry digital certification technology to realize later value-added and truly achieve“Installation has standards, price has basis, after-sales has guarantee, income has been improved”Let water and fertilizer integrate from“invested in the project”Into a long-term income-generating project.